Defining Sequence Flow Ordering

When more than one sequence flow is attached to an activity, the transition that was dragged first will be executed before the transition dragged later. You can specify the ordering of the execution of the transitions. To define the sequence flow order:

  1. In the Process Designer, right-click the activity in the Graph Canvas to which more than one sequence flow is attached and select Sequence Flow Ordering.

  2. On the Sequence Flow Ordering window, select the required activity and move it using Up () and Down () arrows to define the sequence.

  3. Click Done to return to the Graph Canvas.