Replacing the Current Version with Previous Version

You can replace the current version of activity in Adeptia Connect with any of the previous versions of that activity which are stored in the repository of the Git.

Steps to replace the current version of an activity with the previous version 

  1. Select any activity and click the Action  icon, which you want to replace with the previous version. The lists of possible actions are displayed.
  2. Click Replace With option. The Revisions of the selected activity are displayed.



  3. Click the Check-out   icon of the revision, with which you want to replace the current version of the activity. A dialog box is displayed for your confirmation to replace the current version of activity with the selected version.



    If you have modified the activity within Adeptia Connect, which is not checked-in to Git repository, and replace this activity with previous version from Git, then all the modification will be lost.
  4. Click Yes to confirm. 

     


  5. A message is displayed to confirm that the particular version of the activity has been checked-out.



    To know about all the possible synchronization status and their respective icons, click here.