Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Corrected links that should have been relative instead of absolute.

...

  1. Select any activity and click the Action  icon, which you want to replace with the previous version. The lists of possible actions are displayed.
  2. Select the Click Replace With option. The Revisions of the selected activity are displayed.

    Image Added

  3. Click the Check-out  Image Removed icon out   icon of the revision, with which you want to replace the current version of the activity. A dialog box is displayed for your confirmation to replace the current version of activity with the selected version.

    Image Added

    Info
    If you have modified the activity within Adeptia Connect, which is not checked-in to Git repository, and replace this activity with previous version from Git, then all the modification will be lost.
  4. Click Yes to confirm. 

     
    Image Added

  5. A message is displayed to confirm that the particular version of the activity has been checked-out.

    Click Close.
     Image Added

    Info
    To know about all the possible synchronization status and their respective icons, click here.