Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Corrected links that should have been relative instead of absolute.

This section is relevant to you if :

...

you have used the

...

Projects feature of Adeptia Suite in

...

V6.0

...

and now have upgraded to

...

V6.1 or

...

later.

The group-level scope feature of Adeptia Suite allows you to manage your projects based on the group of a user. This means that after you upgrade to Adeptia Suite V6.1 or above, your projects will not be visible to you if:

  • You log-in with a developer user's user-id and password.
  • You log-in with a business user's user-id and password.

You would first need to follow certain steps Perform the following steps, before you again start using the Project feature in Adeptia Suite V6.1 or above. Please follow the below steps in order to configure your Adeptia Suite V6.1 or above and manage backwards compatibility:later.

  1. Login with sysadmin System Admin user type to see all your existing projects.
  2. As the scope of the project is now at the group level,

    so you would first need to

    assign the group to the projects by editing

    them

    all projects.

    Image Removed
    Info

    For more information on how to assign a group to a project,

    please

    refer to

    Steps to Create

    Creating a Project

    Anchor
    Figure_19_2
    Figure_19_2

    section

    .

    If you want to

    To learn

    more

    about the scope of the project,

    please

    refer to

    the

    Group Level Project Scope

    section

    .

  3. If there are activities of multiple groups within a project

    then

    ,

    you need to

    move the objects of that project to a new group and then assign a project to that group.

    Image Removed
    Info

    For

    more

    information on how to move the objects of a project to a new group,

    please

    refer to

    the

    Moving Objects

    Of A

    of a Project

    section

    .

  4. After you assign a group to a project,

    you need to

    assign

    a

    the project to all the

    user

    users in that group.

    Image Removed
    Info

    For more information on how to assign a project to a user,

    please

    refer to

    the

    Assigning a Default Project to a User

    section

    .

  5. Logout as sysadmin System Admin and login as a normal user.