Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You can replace the current version of the activity in Adeptia Connect with any of the previous versions of this that activity which are stored in the repository of the Git.

Steps to replace the current version of an activity with the previous version 

  1. Select any activity and click the Action Image Added icon, which you want to replace with the previous version. The lists of possible actions are displayed.



  2. Select the Replace With option. The Revisions of the selected activity are displayed.



  3. Click the Check-out  Image Added icon of the revision, with which you want to replace the current version of the activity. A dialog box is displayed for your confirmation to replace the current version of activity with the selected version.

    Info
    If you have modified the activity within Adeptia Connect, which is not checked-in to Git repository, and replace this activity with previous version from Git, then all the modification will be lost.
  4. Click Yes to confirm. A message is displayed to confirm that the particular version of the activity has been checked-out.



  5. Click Close.