Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You can also replace the current version of the activity in Adeptia Suite with any of the previous versions of this activity which are stored in the SVN. 

Steps to replace the current version of an activity with the previous version 

  1. On the activity Manage Page, Click the Actions  icon of the activity, which you want to replace. The list of possible actions is displayed (see Figure 691).

    Figure 691: File Event Manage Page

  2. Select the Replace With option. The Revisions of the selected activity are displayed (see Figure 692).

    Figure 692: Revisions Page

  3. Click the Check-out icon of the revision, with which you want to replace the current version of the activity. A dialog box is displayed for your confirmation to replace the current version of activity with the select version (see figure below).


    Figure 693: Confirmation Message

    Info

    If you have modified the activity within Adeptia Suite, which is not checked in to SVN, and replace this activity with previous version from SVN, then all the modification will be lost.

  4. Click Yes to confirm that you want to check that activity. A message is displayed to confirm that the particular version of the activity has been checked out (see Figure 694).

    Figure 694: Confirmation Message

  5. Click on to close this dialog box and return to Manage Page.

    You may notice that on the File Event Manage page, Image Removed icon has been changed to Image Removed icon. It depicts that this the is not the latest version of the activty, which is commited into SVN. You may now work on the checked-out previous revision and can check-in after modification as your current version. The Image Removed icon will be changed to Image Removed icon.
    Info
    IconSignificance
    Image AddedThe activity is not in Version Control.It has never been checked in.
    Image AddedThe activity is modified on latest revision revision_number
    Image AddedThe activity is synchronized with the latest revision revision_number
    Image AddedThe activity is synchronized with the lower revision revision_number